See our products in action
Real-world projects from mining, marine, civil and defence across Australia.
Mackay Sugar Floating Baffle
Mackay Sugar, a leading sugar milling company and part of an international...
700m+
Combined Length
7
Baffles
15yr
Design Life
Custom Tapered Silt Curtains
Chatoyer’s custom tapered silt curtains were used to protect a lake during...
315m
Curtain
2.0m
Max Depth
6wk
Delivery
Debris Boom Traps Rubbish in Tidal Gross Pollutant Trap
A Gross Pollutant Trap (GPT) had been installed in a tidal area...
28m
Boom
10yr
Design Life
Tidal
Operation
Impermeable Silt Curtain for Contaminated Sediment
An impermeable silt curtain required for a large dredging project. Ventia dredged...
700m
Barrier
7m
Max Depth
Zero
Breaches
Heavy Duty Silt Curtain for Rough Conditions
Chatoyer’s silt curtains are well known in the industry. They are high...
1,065m
Containment
Rough
Conditions
2wk
Trial
Custom Portable Bunding
Chatoyer manufactured two custom portable bunding solutions for installation at a coal...
75,000L
Containment
100%
Portable
3
Sites Supported
Protection of Stormwater During Construction
Chatoyer’s custom sized Silt Wardens were installed to provide protection of stormwater...
21km
Motorway
Proven
Protection
EPA
Approved
Heavy Duty Turbidity Curtain Performs Well In Rough Conditions
In the aftermath of the Christchurch, NZ earthquake of 2011, the city...
40kt+
Winds
8kt
Currents
6m
Swells
Bridge Construction Silt Curtain
Maroochydore on Queensland’s Sunshine Coast is undertaking a large redevelopment of its...
150m
Installed
2×75m
Curtain Runs
Class 2
Protection